The Goal
Eliyahu M. Goldratt and Jeff Cox
45 photos of my notes ↓
Page 27
“Have they really increased productivity at your plant?” “Sure they have,” I say. “We had—what?” I scan the ceiling for the figure. “I think it was a thirty-six percent improvement in one area.” “Really . . . thirty-six percent?” asks Jonah. “So your company is making thirty-six percent more money from your plant just from installing some robots? Incredible.” I can’t hold back a smile. “Well . . . no,” I say. “We all wish it were that easy! But it’s a lot more complicated than that. See, it was just in one department that we had a thirty-six percent improvement.”
Page 28
“Well . . . no,” I say. “We all wish it were that easy! But it’s a lot more complicated than that. See, it was just in one department that we had a thirty-six percent improvement.” Jonah looks at his cigar, then extinguishes it in the ashtray. “Then you didn’t really increase productivity,” he says. I feel my smile freeze. “I’m not sure I understand,” I say. Jonah leans forward conspiratorially and says, “Let me ask you something—just between us: Was your plant able to ship even one more product per day as a result of what happened in the department where you installed the robots?”
Page 31
“What’s wrong with my thinking? It’s no different from the thinking of most other managers.” “Yes, exactly,” says Jonah. “What’s that supposed to mean?” I ask; I’m beginning to feel somewhat insulted by this. “Alex, if you’re like nearly everybody else in this world, you’ve accepted so many things without question that you’re not really thinking at all,” says Jonah. “Jonah, I’m thinking all the time,” I tell him. “That’s part of my job.” He shakes his head.
Page 32
“My compliments,” he says. “When you are productive you are accomplishing something in terms of your goal, right?” “Right,” I say as I retrieve my briefcase. We’re rushing past gate after gate. I’m trying to match Jonah stride for stride.
We’re rushing past gate after gate. I’m trying to match Jonah stride for stride. And he’s saying, “Alex, I have come to the conclusion that productivity is the act of bringing a company closer to its goal. Every action that brings a company closer to its goal is productive. Every action that does not bring a company closer to its goal is not productive. Do you follow me?” “Yeah, but . . . really, Jonah, that’s just simple common sense,” I say to him. “It’s simple logic is what it is,” he says.
Page 33
The stewardess is pissed off. “Sir, if you’re not getting on this aircraft, you have to go back to the terminal,” she says coldly. Jonah ignores her. “Alex, you cannot understand the meaning of productivity unless you know what the goal is. Until then, you’re just playing a lot of games with numbers and words.” “Okay, then it’s market share,” I tell him. “That’s the goal.” “Is it?” he asks. He steps into the plane.
Page 39
Wait a minute, I’m thinking. That’s it! Technology: that’s really what it’s all about. We have to stay on the leading edge of technology. It’s essential to the company. If we don’t keep pace with technology, we’re finished. So that’s the goal. Well, on second thought . . . that isn’t right. If technology is the real goal of a manufacturing organization, then how come the most responsible positions aren’t in research and development? How come R&D is always off to the side in every organization chart I’ve ever seen? And suppose we did have the latest of every kind of machine we could use—would it save us? No, it wouldn’t. So technology is important, but it isn’t the goal.
Wait a minute, I’m thinking. That’s it! Technology: that’s really what it’s all about. We have to stay on the leading edge of technology. It’s essential to the company. If we don’t keep pace with technology, we’re finished. So that’s the goal. Well, on second thought . . . that isn’t right. If technology is the real goal of a manufacturing organization, then how come the most responsible positions aren’t in research and development? How come R&D is always off to the side in every organization chart I’ve ever seen? And suppose we did have the latest of every kind of machine we could use—would it save us? No, it wouldn’t. So technology is important, but it isn’t the goal.
Page 40
Wait a minute. Suppose I did some incredibly brilliant thing and stemmed the losses so we broke even. Would that save us? Not in the long run, it wouldn’t. The plant wasn’t built just so it could break even. UniCo is not in business just so it can break even. The company exists to make money. I see it now. The goal of a manufacturing organization is to make money. Why else did J. Bartholomew Granby start his company back in 1881 and go to market with his improved coal stove? Was it for the love of appliances? Was it a magnanimous public gesture to bring warmth and comfort to millions? Hell, no.
Page 41
Money must be the goal. Nothing else works in its place. Anyway, it’s the one assumption I have to make. If the goal is to make money, then (putting it in terms Jonah might have used), an action that moves us toward making money is productive. And an action that takes away from making money is non-productive. For the past year or more, the plant has been moving away from the goal more than toward it. So to save the plant, I have to make it productive; I have to make the plant make money for UniCo.
Page 43
Then it occurs to me: those three guys are doing something now, but is that going to help us make money? They might be working, but are they productive? For a moment, I consider going back and telling the supervisor to make those guys actually produce. But, well . . . maybe there really isn’t anything for them to work on right now. And even though I could perhaps have those guys shifted to someplace where they could produce, how would I know if that work is helping us make money? That’s a weird thought. Can I assume that making people work and making money are the same thing? We’ve tended to do that in the past.
Page 47
“Yeah, but suppose you’ve got enough cash coming in every month to meet expenses for a year,” I tell him. “If you’ve got enough of it, then cash flow doesn’t matter.” “But if you don’t, nothing else matters,” says Lou. “It’s a measure of survival: stay above the line and you’re okay; go below and you’re dead.” We look each other in the eye. “It’s happening to us, isn’t it?” Lou asks. I nod.
Page 49
Man, think of it. We’d really be making money if we could have all of the measurements go up simultaneously and forever. So this is the goal: To make money by increasing net profit, while simultaneously increasing return on investment, and simultaneously increasing cash flow. I write that down in front of me. I feel like I’m on a roll now. The pieces seem to be fitting together. I have found one clear-cut goal. I’ve worked out three related measurements to evaluate progress toward the goal.
Page 51
I want to ask him, “Say, Eddie, how’s our impact on ROI been in the last hour? By the way, what’s your shift done to improve cash flow? Are we making money?” It’s not that Eddie hasn’t heard of those terms. It’s just that those concerns are not part of his world. His world is one measured in terms of parts per hour, man-hours worked, numbers of orders filled. He knows labor standards, he knows scrap factors, he knows run times, he knows shipping dates. Net profit, ROI, cash flow—that’s just headquarters talk to Eddie.
Page 60
“What kind of measurements are those?” I ask. “They’re measurements which express the goal of making money perfectly well, but which also permit you to develop operational rules for running your plant,” he says. “There are three of them. Their names are throughput, inventory and operational expense.” “Those all sound familiar,” I say. “Yes, but their definitions are not,” says Jonah. “In fact, you will probably want to write them down.”
Pen in hand, I flip ahead to a clean sheet of paper on my tablet and tell him to go ahead. “Throughput,” he says, “is the rate at which the system generates money through sales.” I write it down word for word. Then I ask, “But what about production? Wouldn’t it be more correct to say—”
Then I ask, “But what about production? Wouldn’t it be more correct to say—” “No,” he says. “Through sales—not production. If you produce something, but don’t sell it, it’s not throughput. Got it?” “Right. I thought maybe because I’m plant manager I could substitute—” Jonah cuts me off.
And remember that if you want to change one of them, you will have to change at least one of the others as well.” “Okay,” I say warily. “The next measurement is inventory,” he says. “Inventory is all the money that the system has invested in purchasing things which it intends to sell.”
Page 61
I write it down, but I’m wondering about it, because it’s very different from the traditional definition of inventory. “And the last measurement?” I ask. “Operational expense,” he says. “Operational expense is all the money the system spends in order to turn inventory into throughput.” “Okay,” I say as I write. “But what about the labor invested in inventory? You make it sound as though labor is operational expense?” “Judge it according to the definitions,” he says.
“Alex, I really have to run. And I know you are smart enough to figure it out on your own; all you have to do is think about it,” he says. “Just remember we are always talking about the organization as a whole—not about the manufacturing department, or about one plant, or about one department within the plant. We are not concerned with local optimums.” “Local optimums?” I repeat. Jonah sighs. “I’ll have to explain it to you some other time.”
Pages 73–74
“Would the company stay in business if all it did was manufacture products to fill those warehouses?” “Okay, okay,” Bob says sheepishly, seeing the meaning now. “So we got to sell the stuff to make money.” Lou is still staring at the board. “Interesting, isn’t it, that each one of those definitions contains the word money,” he says. “Throughput is the money coming in. Inventory is the money currently inside the system. And operational expense is the money we have to pay out to make throughput happen. One measurement for the incoming money, one for the money still stuck inside, and one for the money going out.” “Well, if you think about all the investment represented by what we’ve got sitting out there on the floor, you know for sure that inventory is money,” says Stacey. “But what bothers me is that I don’t see how he’s treating value added to materials by direct labor.” “I wondered the same thing, and I can only tell you what he told me,” I say.
Page 74
Stacey and the rest of us think about this for a minute. The room gets quiet again. Then Stacey says, “Maybe Jonah feels direct labor shouldn’t be a part of inventory because the time of the employees isn’t what we’re really selling. We ‘buy’ time from our employees, in a sense, but we don’t sell that time to a customer—unless we’re talking about service.” “Hey, hold it,” says Bob. “Now look here: if we’re selling the product, aren’t we also selling the time invested in that product?” “Okay, but what about idle time?” I ask.
Page 75
“How about scrap?” he asks. “That’s operational expense, too.” “Yeah? What about what we sell to the scrap dealer?” “Okay, then it’s the same as a machine,” says Lou. “Any money we’ve lost is operational expense; any investment that we can sell is inventory.” “The carrying costs have to be operational expense, don’t they?” asks Stacey. Lou and I both nod.
Page 87
“No, not by cutting people,” I say. “What we do by laying off workers is cut our expenses.” “Yes, exactly,” Jonah says. “You improve only one measurement, operational expense.” “Isn’t that enough?” “Alex, the goal is not to reduce operational expense by itself. The goal is not to improve one measurement in isolation. The goal is to reduce operational expense and reduce inventory while simultaneously increasing throughput,” says Jonah. “Fine. I agree with that,” I say. “But if we reduce expenses, and inventory and throughput stay the same, aren’t we better off?” “Yes, if you do not increase inventory and/or reduce throughput,” he says. “Okay, right. But balancing capacity doesn’t affect either one,” I say.
“No, not by cutting people,” I say. “What we do by laying off workers is cut our expenses.” “Yes, exactly,” Jonah says. “You improve only one measurement, operational expense.” “Isn’t that enough?” “Alex, the goal is not to reduce operational expense by itself. The goal is not to improve one measurement in isolation. The goal is to reduce operational expense and reduce inventory while simultaneously increasing throughput,” says Jonah. “Fine. I agree with that,” I say. “But if we reduce expenses, and inventory and throughput stay the same, aren’t we better off?” “Yes, if you do not increase inventory and/or reduce throughput,” he says. “Okay, right. But balancing capacity doesn’t affect either one,” I say.
“No, not by cutting people,” I say. “What we do by laying off workers is cut our expenses.” “Yes, exactly,” Jonah says. “You improve only one measurement, operational expense.” “Isn’t that enough?” “Alex, the goal is not to reduce operational expense by itself. The goal is not to improve one measurement in isolation. The goal is to reduce operational expense and reduce inventory while simultaneously increasing throughput,” says Jonah. “Fine. I agree with that,” I say. “But if we reduce expenses, and inventory and throughput stay the same, aren’t we better off?” “Yes, if you do not increase inventory and/or reduce throughput,” he says. “Okay, right. But balancing capacity doesn’t affect either one,” I say.
“I didn’t say anything of the sort. I asked you. And you assumed that if you trim capacity to balance with market demand you won’t affect throughput or inventory,” he says. “But, in fact, that assumption—which is practically universal in the western business world—is totally wrong.” “How do you know it’s wrong?” “For one thing, there is a mathematical proof which could clearly show that when capacity is trimmed exactly to marketing demands, no more and no less, throughput goes down, while inventory goes through the roof,” he says. “And because inventory goes up, the carrying cost of inventory—which is operational expense—goes up. So it’s questionable whether you can even fulfill the intended reduction in your total operational expense, the one measurement you expected to improve.” “How can that be?”
Page 88
“One phenomenon is called ‘dependent events.’ Do you know what I mean by that term? I mean that an event, or a series of events, must take place before another can begin . . . the subsequent event depends upon the ones prior to it. You follow?” “Yeah, sure,” I say. “But what’s the big deal about that?” “The big deal occurs when dependent events are in combination with another phenomenon called ‘statistical fluctuations,’ ” he says. “Do you know what those are?” I shrug. “Fluctuations in statistics, right?”
“Let me put it this way,” he says. “You know that some types of information can be determined precisely. For instance, if we need to know the seating capacity in this restaurant, we can determine it precisely by counting the number of chairs at each table.” He points around the room. “But there are other kinds of information we cannot precisely predict. Like how long it will take the waiter to bring us our check. Or how long it will take the chef to make an omelet. Or how many eggs the kitchen will need today. These types of information vary from one instance to the next. They are subject to statistical fluctuations.”
Pages 100–101
So I’ve got limits on how fast I can go—both my own (I can only go so fast for so long before I fall over and pant to death) and those of the others on the hike. However, there is no limit on my ability to slow down. Or on anyone else’s ability to slow down. Or stop. And if any of us did, the line would extend indefinitely. What’s happening isn’t an averaging out of the fluctuations in our various speeds, but an accumulation of the fluctuations. And mostly it’s an accumulation of slowness—because dependency limits the opportunities for higher fluctuations. And that’s why the line is spreading. We can make the line shrink only by having everyone in the back of the line move much faster than Ron’s average over some distance. Looking ahead, I can see that how much distance each of us has to make up tends to be a matter of where we are in the line.
Page 102
And what is operational expense? It’s whatever lets us turn inventory into throughput, which in our case would be the energy the boys need to walk. I can’t really quantify that for the model, except that I know when I’m getting tired.
Page 138
“What we know now,” I tell him, “is that we shouldn’t be looking at each local area and trying to trim it. We should be trying to optimize the whole system. Some resources have to have more capacity than others. The ones at the end of the line should have more than the ones at the beginning—sometimes a lot more. Am I right?” “You’re on the money,” says Jonah.
Page 139
I whisper to everybody to start taking some notes on this. “A bottleneck,” Jonah continues, “is any resource whose capacity is equal to or less than the demand placed upon it. And a non-bottleneck is any resource whose capacity is greater than the demand placed on it. Got that?” “Right,” I tell him.
He says, “Yes, but as you already know, you should not balance capacity with demand. What you need to do instead is balance the flow of product through the plant with demand from the market. This, in fact, is the first of nine rules that express the relationships between bottlenecks and non-bottlenecks and how you should manage your plant. So let me repeat it for you: Balance flow, not capacity.”
Page 140
“No, bottlenecks are not necessarily bad—or good,” says Jonah, “they are simply a reality. What I am suggesting is that where they exist, you must then use them to control the flow through the system and into the market.” That makes sense to me as I’m listening, because I’m remembering how I used Herbie to control the troop during the hike.
Page 141
“I don’t know,” I tell him. “I guess the first thing to do is find out if we’ve got a bottleneck.” “So we go look for Herbie,” says Ralph. “If he’s out there.” “Yeah, quick, before we talk ourselves to death,” says Bob.
Page 142
Having done that, we’re now in the process of calculating the hours each “work center” has to contribute. We’re defining a work center as any group of the same resources. Ten welders with the same skills constitute a work center.
Four identical machines constitute another. The four machinists who set up and run the machines are still another, and so on. Dividing the total of work center hours needed, by the number of resources in it, gives us the relative effort per resource, a standard we can use for comparison.
Page 143
“Obviously, we’re not going to have time for that,” I say. “We’ve only got ten weeks now to make something happen before Peach blows the whistle. I know we’re on the right track, but we’re still just limping along here. We’ve got to accept the fact we’re not going to have perfect data to work with.” Ralph says, “Then I have to remind you of the old data processing aphorism: Garbage in, garbage out.”
Page 152
“I’m not talking about more capacity from one end of the plant to the other,” says Jonah. “To increase the capacity of the plant is to increase the capacity of only the bottlenecks.” “You mean make them into non-bottlenecks,” says Stacey.
“You mean make them into non-bottlenecks,” says Stacey. “No,” he says. “Absolutely not. The bottlenecks stay bottlenecks. What we must do is find enough capacity for the bottlenecks to become more equal to demand.” “Where’re we going to find it?” asks Bob. “You mean it’s just layin’ around out there?”
Page 154
Lou edges in and and says, “Excuse me, but you’re not actually suggesting we use that old equipment, are you?” “If it’s still operational, then yes, I might suggest it,” says Jonah. Lou’s eyes blink.
Page 155
“We’re not sure all the parts in that pile would translate into immediate sales,” says Stacey. “Oh really? You are making your bottlenecks work on parts that will not contribute to throughput?” asks Jonah. “Well . . . some of them become spare parts or they go into finished goods inventory. Eventually it becomes throughput,” says Lou.
Page 156
“And each part means you can ship a product?” “Generally, yes,” she says. “And each product shipped means a thousand dollars,” says Jonah. “A thousand units times a thousand dollars is how much money?”
In unison, our faces turn toward the mountain. “One million dollars,” I say with awe. “On one condition!” says Jonah. “That you get these parts in and out of heat-treat and shipped as a finished product before your customers get tired of waiting and go elsewhere!”
Page 157
I ask, “You mean we should put Q.C. in front of the bottlenecks?” Jonah raises a finger and says, “Very perceptive of you. Make sure the bottleneck works only on good parts by weeding out the ones that are defective. If you scrap a part before it reaches the bottleneck, all you have lost is a scrapped part. But if you scrap the part after it’s passed the bottleneck, you have lost time that cannot be recovered.”
Page 158
“Both of those amounts are incorrect,” says Jonah. “But our cost data—” “The numbers are wrong, not because you have made a calculating error, but because the costs were determined as if these work centers existed in isolation,” says Jonah.
“That’s what’s going on here,” he says between puffs. “You have calculated the cost of operating these two works centers according to standard accounting procedures . . . without considering the fact that both are bottlenecks.” “How does that change their costs?” asks Lou.
“How does that change their costs?” asks Lou. “What you have learned is that the capacity of the plant is equal to the capacity of its bottlenecks,” says Jonah. “Whatever the bottlenecks produce in an hour is the equivalent of what the plant produces in an hour. So . . . an hour lost at a bottleneck is an hour lost for the entire system.”
Page 159
“How many hours a month did you say it’s available for production?” “About 585,” says Ralph. “The actual cost of a bottleneck is the total expense of the system divided by the number of hours the bottleneck produces,” says Jonah. “What does this make it?”
“Of course it does,” says Jonah. “And with that in mind, how do we optimize the use of the bottlenecks? There are two principal themes on which you need to concentrate . . . “First, make sure the bottlenecks’ time is not wasted,” he says. “How is the time of a bottleneck wasted? One way is for it to be sitting idle during a lunch break. Another is for it to be processing parts which are already defective—or which will become defective through a careless worker or poor process control. A third way to waste a bottleneck’s time is to make it work on parts you don’t need.” “You mean spare parts?” asks Bob.
“He’s right,” admits Lou. “Then make the bottlenecks work only on what will contribute to throughput today . . . not nine months from now,” says Jonah. “That’s one way to increase the capacity of the bottlenecks.
“That’s one way to increase the capacity of the bottlenecks. The other way you increase bottleneck capacity is to take some of the load off the bottlenecks and give it to non-bottlenecks.” I ask, “Yeah, but how do we do that?”
Page 205
“Okay, I see I’m going to have to explain some of the basic relationships between bottlenecks and non-bottlenecks,” says Jonah. Then he looks at me and says, “By the way, do you remember when I told you that a plant in which everyone is working all the time is very inefficient? Now you’ll see exactly what I was talking about.”
Page 210
He points to the NCX-10. “A major constraint here in your system is this machine,” says Jonah. “When you make a non-bottleneck do more work than this machine, you are not increasing productivity. On the contrary, you are doing exactly the opposite. You are creating excess inventory, which is against the goal.” “But what are we supposed to do?” asks Bob. “If we don’t keep our people working, we’ll have idle time, and idle time will lower our efficiencies.”
“Just take a look behind you,” says Jonah. “Take a look at the monster you’ve made. It did not create itself. You have created this mountain of inventory with your own decisions. And why? Because of the wrong assumption that you must make the workers produce one hundred percent of the time, or else get rid of them to ‘save’ money.”
“Why is ninety percent acceptable?” asks Jonah. “Why not sixty percent, or twenty-five? The numbers are meaningless unless they are based upon the constraints of the system. With enough raw materials, you can keep one worker busy from now until retirement. But should you do it? Not if you want to make money.”
Then Ralph suggests, “What you’re saying is that making an employee work and profiting from that work are two different things.” “Yes, and that’s a very close approximation of the second rule we can logically derive from the four combinations of X and Y we talked about,” says Jonah.
“Yes, and that’s a very close approximation of the second rule we can logically derive from the four combinations of X and Y we talked about,” says Jonah. “Putting it precisely, activating a resource and utilizing a resource are not synonymous.”
Page 211
He tells us that with an increase in throughput, it is possible to create new bottlenecks. But most plants have so much extra capacity that it takes an enormous increase in throughput before this happens. We’ve only had a twenty percent increase.
Page 219
“So are we just supposed to let everyone stand around out there?” asks Bob. “Why not?” asks Stacey. “Once the somebody is already on the payroll, it doesn’t cost us any more to have him be idle. Whether somebody produces parts or waits a few minutes doesn’t increase our operating expense. But excess inventory . . . now that ties up a lot of money.”
Pages 231–232
Part of what Jonah told me last night over the phone had to do with the time a piece of material spends inside a plant. If you consider the total time from the moment the material comes into the plant to the minute it goes out the door as part of a finished product, you can divide that time into four elements. One of them is setup, the time the part spends waiting for a resource, while the resource is preparing itself to work on the part. Another is process time, which is the amount of time the part spends being modified into a new, more valuable form. A third element is queue time, which is the time the part spends in line for a resource while the resource is busy working on something else ahead of it. The fourth element is wait time, which is the time the part waits, not for a resource, but for another part so they can be assembled together. As Jonah pointed out last night, setup and process are a small portion of the total elapsed time for any part.
Page 233
“No, it isn’t,” I tell him. “Since we began withholding materials from the floor until the bottlenecks are ready for them, the non-bottlenecks now have idle time. It’s perfectly okay to have more setups on non-bottlenecks, because all we’re doing is cutting into time the machines would spend being idle. Saving setups at a non-bottleneck doesn’t make the system one bit more productive. The time and money saved is an illusion. Even if we double the number of setups, it won’t consume all the idle time.”
Page 259
“Two, the incentives we usually offer are based on the assumption that the level of utilization of any worker is determined by his own potential,” I tell them. “That’s totally false because of dependency. For any resource that is not a bottleneck, the level of activity from which the system is able to profit is not determined by its individual potential but by some other constraint within the system.” Hilton says impatiently, “What’s the difference? When somebody is working, we’re getting use out of him.”